GM Ramos
Large scale manufacturing facility with over 2,200,000 CFM deployed across 42 custom outdoor, direct-fired heating, and chilled water cooling units. All the power, controls, and piping were complete for single-point connection by the installing contractor. Location Ramos, Mexico Solution ⦁ An engineered common solution to simplify production to meet the project schedule. ⦁ Worked with […]
FCA WS/WL MACK
A total of 3.3 Million CFM – (53) AHU for a large-scale new paint shop building. Designing efficient and effective filtering and conditioning for paint process. Location Detroit Challenge Size and scope of the project with an aggressive project schedule. Solution ⦁ Design and deliver AHU for the first large-scale paint shop. ⦁ Worked closely […]